snippet:
|
Road Maintenance Camps for each Commissioner Precinct.
June 2024 Updates to contact information and revise Pct 1 camps combing sections of the previous 3... |
summary:
|
Road Maintenance Camps for each Commissioner Precinct.
June 2024 Updates to contact information and revise Pct 1 camps combing sections of the previous 3... |
accessInformation:
|
Harris County Engineering Department GIS, Each commissioner precinct. Camp contacts to be added. |
thumbnail:
|
|
maxScale:
|
5000 |
typeKeywords:
|
[] |
description:
|
<DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>Last update: June 2024 Updates to contact information and revise Pct 1 camps combing sections of the previous 3 camps into only 2, Miller and El Rio. Per Pct request. Update Pct 2 contact info per Pct request.</SPAN></P><P><SPAN><SPAN>2/28/24 Spatial edits only to improve geometry. No official boundary change, no schema change, no attribute change. Geometry edits along precinct lines and snapping to adjacent camps.</SPAN></SPAN></P><P><SPAN>Older info:</SPAN></P><P><SPAN>*** MASTER COPY EDITED TO INCLUDE ROAD LOG CHANGES PER REDISTRICTING COMPLETE JUNE 2022Displays Road Maintenance Camps redrawn after 2021 redistricting of Commissioners Precincts.Completed FEB 2022 by HCEng GIS with input from each precinct. Contact data to be added.</SPAN></P></DIV></DIV></DIV> |
licenseInfo:
|
<DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>DISCLAIMER:THIS MAP REPRESENTS THE BEST INFORMATION AVAILABLE TO HARRIS COUNTY. HARRIS COUNTY DOES NOT WARRANT ITS ACCURACY OR COMPLETENESS, HENCE NO RESPONSIBILITY CAN BE ASSUMED BY THE PUBLISHER.</SPAN></P></DIV></DIV></DIV> |
catalogPath:
|
|
title:
|
RoadMaintCamps |
type:
|
|
url:
|
|
tags:
|
["Infrastructure","Roads","Repair","Overlays","Refurbishment","Construction","Transportation","Mowing","ROW","Maintenance","Traffic","boundaries"] |
culture:
|
en-US |
name:
|
|
guid:
|
|
minScale:
|
150000000 |
spatialReference:
|
|